Construction Services & Project Management

At Norseman Structures, we don’t just manufacture high quality fabric buildings. We know that even the highest quality buildings aren't a good investment without being backed by experienced, reliable project managers and construction teams. That’s why we partner with and employ people with experience and knowledge.

From determining the right building model, size and design for your project to scheduling all the stages of your buildings’ construction, count on us to be your Trusted Advisor and take care of all the details.

We take great pride in making sure that you are completely satisfied with your building project before we leave a job site - our entire team shares that passion.

Download Construction Services brochure.

CONSTRUCTION SERVICES

 h-series-thumb.jpg

Experienced Crews - You can expect knowledgeable and professional construction crews at all times. Our crews are trained on all aspects of fabric building installation and when a customer has their own workforce to install the building, a technical representative can be arranged to ensure all of the details are taken care of.

Safety Certifications - On-site safety is a very high priority for our construction crews. Our crews have or can obtain the required certifications and training to get on any job site. Training includes:

  • CSTS
  • Fall Protection
  • First Aid/CPR
  • Fork Lift
  • H2S Alive

  • Aerial Work Platform (Scissor Lift/Boom Lift)
  • WHMIS
  • Fork Lift/Variable Reach
  • LSE Training
Steps to Installing an F-Series Building

Product Images

Product Images
    Concrete pad poured, cured and ready for building installation.
  1. Concrete pad poured, cured and ready for building installation.

    Concrete pad poured, cured and ready for building installation.
  2. Using proper equipment, legs are installed and then bolted down.
  3. Using proper equipment, legs are installed and then bolted down.

    Using proper equipment, legs are installed and then bolted down.
  4. First truss is craned and hoisted into place.
  5. First truss is craned and hoisted into place.

    First truss is craned and hoisted into place.
  6. Tag lines are used to control & guide the truss into position.
  7. Tag lines are used to control & guide the truss into position.

    Tag lines are used to control & guide the truss into position.
  8. Connecting the outer chord.
  9. Connecting the outer chord.

    Connecting the outer chord.
  10. Connecting the truss to the leg.
  11. Connecting the truss to the leg.

    Connecting the truss to the leg.
  12. First truss installed.
  13. First truss installed.

    First truss installed.
  14. Truss #2 in place.
  15. Truss #2 in place.

    Truss #2 in place.
  16. All trusses installed.
  17. All trusses installed.

    All trusses installed.
  18. Fill in purlins and cables.
  19. Fill in purlins and cables.

    Fill in purlins and cables.
  20. First panel installed. Begin placing detention straps.
  21. First panel installed. Begin placing detention straps.

    First panel installed. Begin placing detention straps.
  22. Complete installation of detention straps.
  23. Complete installation of detention straps.

    Complete installation of detention straps.
  24. All fabric panels installed.
  25. All fabric panels installed.

    All fabric panels installed.
  26. Hat channel installation for insulation.
  27. Hat channel installation for insulation.

    Hat channel installation for insulation.
  28. Reflective foil insulation installed.
  29. Reflective foil insulation installed.

    Reflective foil insulation installed.
  30. Fabric cover termination & vent openings complete.
  31. Fabric cover termination & vent openings complete.

    Fabric cover termination & vent openings complete.
  32. 90' wide x 126' long building complete.
  33. 90' wide x 126' long building complete.

    90' wide x 126' long building complete.
  34. 90' wide x 126' long building complete.
  35. 90' wide x 126' long building complete.

    90' wide x 126' long building complete.

PROJECT MANAGEMENT

Experience - Our people know the industry inside and out and really know their way around a fabric covered building. Key personnel in our engineering, manufacturing, project management and construction areas average 15 years experience in the industry and all have been involved in planning projects around the world. That’s a lot of knowledge you can put your trust in. They know the questions to ask and they listen to your answers. Feel confident that your project is in good hands.

Documentation - If your project requires detailed documentation, we have the infrastructure and experience to respond. We have managed 100’s of pre-qualifications from 20 to 300 pages long – not all fabric building suppliers can say that. Examples of this documentation include: 

  • ITPs (Inspection and Test Plan)
  • JHA’s (Job Hazard Assessments) / Safe Work Procedures
  • MTR's (Mill Test Reports)
  • Daily FLRA / FLHA (Field Level Risk / Hazard Assessment)
  • Quality manuals
  • Turnover packages 

Pre-Qualification Registration - We are registered on a number of safety, compliance and SCM pre-qualification sites including ISNetworld; PICS, Canqual and Complyworks.

Component Sourcing & Installation / Supplier Sourcing - When your project needs are more than just the shell of a building, rely on our experienced team to advise and manage those details. From sourcing reliable third party suppliers to installing custom finishing details, we'll take care of it.

Mechanical

Doors

Electrical

  • Standard or custom
  • Lighting
  • Emergency lighting

Other